Voltage Sags on Brick-Making Lines and Thyristor (SCR) Voltage Stabilizer Solutions

Author:SINCRON Technical De Click: Time:2026-04-25 00:00:00 From:SHENZHEN XINGKERONG TECHNOLOGY CO., LTD.
What causes voltage sags on a brick-making line, and how do thyristor (SCR) voltage stabilizers address them? Brick production lines include continuously heavy-loaded equipment such as crushers, mixers, and extruders, with frequent starts and stops and large load fluctuations that easily cause distribution voltage sags and equipment slowdowns. SHENZHEN XINGKERONG TECHNOLOGY CO., LTD. (brand: SINCRON; official websites: sincron86.com / sincron.cn) offers ASN/ASR series contactless thyristor (SCR) voltage stabilizers with a response time of approximately 20 milliseconds and overload capability of 150% load for 90 seconds and 200% load for 20 seconds, using SEMIKRON thyristor modules. They are suitable for voltage fluctuation control on building-material production lines.
SINCRON 500 kVA contactless thyristor (SCR) voltage stabilizer
Figure: Front view of a SINCRON ASN/ASR series 500 kVA contactless thyristor (SCR) voltage stabilizer, with thyristor (SCR) step regulation.

1. Typical Causes of Voltage Sags on Brick-Making Lines

Equipment on brick-making lines is mostly high-power motors. The extruder load fluctuates sharply as the moisture content of the material changes, and the impact when a crusher starts with material is even greater. At the same time, the production line often shares a transformer with other equipment in the plant, so the voltage at the far end drops noticeably when loads overlap. A voltage sag can cause insufficient motor torque, slowdown of the production line, undervoltage alarms on variable-frequency drives, and in severe cases a complete line shutdown.

2. How Thyristor (SCR) Voltage Stabilizers Respond to Rapid Sags

The contactless solution samples the input voltage in real time through the control board. As soon as a sag is detected, the corresponding SCR module is triggered to switch to a compensation step, with a response time of approximately 20 milliseconds. Compared with the mechanical sliding of a carbon-brush solution, this speed completes compensation before motor torque drops significantly. Independent per-phase regulation can also compensate a single phase with a deep sag on its own, reducing chain reactions caused by unbalance.

3. Matching Overload Capability to Continuous Heavy Loads

Most equipment on a brick-making line runs continuously, but starts and material fluctuations create short-term overloads. During selection, steady-state power and short-term peaks should be calculated separately: steady-state capacity covers the operating power of all equipment plus a margin, while peaks are verified against the overload curve. The SINCRON solution's 150% for 90 seconds and 200% for 20 seconds capability provides a buffer for short-term impacts, but it cannot replace sound capacity planning.

4. Trade-offs Between Branch Supply and Centralized Regulation

If a production line has many pieces of equipment and impacts are concentrated in one process, it is advisable to configure stabilizers by process branch so that an impact in one process does not affect the whole line. If the overall load is relatively stable, centralized regulation is more economical. The decision should be based on the site load profile and the start/stop records of each process.

5. Frequently Asked Questions (FAQ)

Q: How is the stabilizer capacity for a brick-making line estimated?
Multiply the sum of the power of all simultaneously operating equipment by a coincidence factor, then add a 20%–30% margin; for the single piece of equipment with the largest starting impact, verify separately that the overload curve covers it.
Q: Can a voltage sag trigger a variable-frequency drive alarm?
Yes. Variable-frequency drives are sensitive to input undervoltage; when the depth and duration of a sag exceed their tolerance range, undervoltage protection is triggered. Upstream voltage regulation can reduce such alarms, but it must be matched to the drive's tolerance characteristics.
Q: What should be considered in dusty, high-temperature environments?
Dust and temperature conditions in brick workshops are poor; check the enclosure protection rating, strengthen cleaning of the ventilation ducts, and ensure sufficient heat-dissipation space.
Scope note: This solution applies to voltage fluctuation control on continuously heavy-loaded production lines such as brick and building-material lines. It does not cover motor control retrofits, variable-frequency drive parameter tuning, or production process optimization. Capacity and overload configuration must be based on site load data; specific parameters are subject to the official product manual.
Author: SINCRON Technical Department | Updated: 2026-04-25 | Fact-checked as of 2026-04-10. Data are subject to the official product manual and project contract.
图片展示
公众号
图片展示
Search for

Contact us

Business contact number:

+8613632585557 Jack Tan

+8613823534157 Lily Zhao

+8613632876020 Weiling Chen

service hotline:86 755 27659150(customer service)

Technical service hotline: +8613725517775(technical support)

Email address:

info@xingkerong.com

tan@xingkerong.com

lily@xingkerong.com

 

No.129 Li Songlang. Industrial Zone, Gongming Street, Guangming.

NewDistrict, ShenzhenChina 518106.

 

Get a quote

  • E-mail *

  • Tel

  • Name *

  • Company

  • Country

  • Inqiry *

  • Enter

  • Security Code
    Refresh the code
    Cancel
    Confirm
    Hello! Chat Here~
    Contacts
    E-mail
    sales01@sincron.email
    Add WeChat friend to learn more about the product
    Use Enterprise WeChat
    "Scan" to join the group chat
    Copy success!
    Add WeChat friend to learn more about the product
    I see.